Legal – Expert Witness (Interference Issues)
Client
DeepTek
Finesse investigation for DeepTek surrounding EMC (Electro Magnetic Compatibility) issues relating to umbilical cable design.
Pipelay & Mooring Winches
Client
Technip’s Apache
Finesse’s first major experience in the marine construction industry came when Technip decided to move the Pipelay equipment from the Old Apache Pipelay vessel to the then new Apache (II) vessel.

150T A&R Winch
Client
McDermott
McDermott were adding a 150 Tone winch to one of their vessels for lifting heavy equipment on and off the sea bed.

Winch Control Suites for Pipeline Vessel the Seven Waves
Client
Subsea 7
Subsea 7’s Seven Waves pipeline vessel needed a control system for a spread of 10 electrically driven deck winches.