Case Study

Client

Optima Sea Water Pump Control

Project

Pump Control System & MCC powering 4 x 300kW Pumps

optima paneloptima logo

This was the largest power system for which Finesse has had design and manufacture responsibility.  A 7m long suit of panels with 2000A distribution busbars, system consisting of dual redundant incoming supply, and power distribution to 4 x 300kW soft starts for starting and running emergency fire suppression pumps, designed to deluge site in the event of a catastrophic fire. 

Scope of supply included the PLC control for sequencing the pumps. The PLC provided monitoring and alarm to the control room if ever less than 2 pumps available and ready for service. Due to inrush current draw on supply only one pump could be started at a time, so PLC control software included sequencing & monitoring identifying pump availability and  ensuring a sequenced staggered start, whereby in the event of a requirement triggering the 2 duty pumps always start in sequence and if either fails to start the 2 standby pumps can be automatically called into play.  

Get in touch

If you have an idea you want to bring to life, get in touch with us to see how we can make it happen.
Contact us